| Survey & management plan | Any sale, purchase, remortgage or dispute where a lender, surveyor or solicitor has asked what the plant is and what it affects. | Site visit 1–2 hours; written report typically within 5 working days. | A survey identifies and quantifies the problem — it does not treat it. Underground extent is inferred from surface evidence, not excavation. | Not applicable; the survey is the document that establishes whether guarantee-backed work is available. | Positive identification, mapped stand extent, proximity to structures and boundaries, photographs, risk rating and a costed plan. |
|---|
| Herbicide treatment programme | Gardens, boundaries and amenity land where the stand can be left in place and the timescale is not driven by imminent development. | Typically 3–5 growing seasons of applications plus monitoring visits; visible dieback usually within 4–6 weeks of the first application. | Rhizome remains in the ground during the programme. Not suitable close to open water without a permit, or where the ground has to be built on soon. Weather and access affect timing. | Usually eligible for an insurance-backed guarantee, subject to survey findings and insurer criteria; terms and exclusions are confirmed in writing. | Management plan, dated treatment log, photographic record at each visit, annual monitoring reports and, where issued, the IBG certificate. |
|---|
| Herbicide plus root barrier or cell burial | Sites where the stand sits against a boundary or a planned structure and the material can stay on site. | Installation days to a week; herbicide monitoring continues alongside, commonly 2–3 seasons. | Needs space, machine access and (in England) compliance with Environment Agency burial requirements. Barriers control spread; they do not kill the plant. | Often eligible where the design and monitoring regime meet insurer requirements; confirmed case by case. | Design drawing, burial or barrier record, waste and materials documentation, monitoring reports. |
|---|
| Excavation and removal off site | Development, groundworks, or a sale that cannot wait — where the ground must be clean now. | Commonly 1–5 days on site depending on volume and access. | Highest cost. Contaminated soil is controlled waste: registered carrier and permitted landfill required. Restricted access, services and neighbouring land can rule it out. | Typically eligible for a guarantee on verified clearance, subject to validation excavation and insurer criteria. | Excavation method statement, waste transfer notes, tipping receipts, validation photographs and a completion report. |
|---|
| On-site screening or soil remediation | Larger sites with volume to process and space to work, where landfill costs would be disproportionate. | Project-specific; typically 1–3 weeks plus a monitoring period. | Needs plant, space and a competent supervising specialist. Not viable on small residential plots. | Eligibility depends on the remediation method and the monitoring period agreed at the outset. | Remediation strategy, screening records, verification sampling, monitoring reports. |
|---|
| Monitor only | Isolated stands with no structural or amenity impact, where an owner wants a documented position rather than works. | Annual inspection, ongoing. | The plant continues to grow. Lenders and buyers rarely accept monitoring alone where the stand affects a structure or usable garden. | Not eligible — no treatment work is being carried out. | Dated inspection reports and photographs showing change over time. |
|---|